|
Land Use Department
Planning & Zoning
Inland Wetlands
| Planning & Zoning Official: Steven Palmer |
| Staff: |
Beth Cavagna, Nancy LoBalbo |
| Phone: |
(203) 794-8578 |
| Fax: |
(203) 778-7518 |
| Email: |
landuse@betheltownhall.org |
| Office Hours: |
Monday - Friday, 8:30 am - 4:30 pm |
The Land Use Department is responsible for the administration and enforcement of the zoning, subdivision and wetlands regulations of the Town of Bethel. Staff provides the technical support to the Planning & Zoning Commission, Zoning Board of Appeals, the Inland Wetlands Commission and the Open Space Committee as well as assistance to the general public on all land use matters.
NEW
Route 6 Corridor Study Final Draft January 2008, Part 1 of 5 (8.5 mb)
Route 6 Corridor Study Final Draft January 2008, Part 2 of 5 (9.1 mb)
Route 6 Corridor Study Final Draft January 2008, Part 3 of 5 (10.6 mb)
Route 6 Corridor Study Final Draft January 2008, Part 4 of 5 (12.8 mb)
Route 6 Corridor Study Final Draft January 2008, Part 5 of 5 (18.9 mb)
Board and Commission 2007 Meetings
GIS Mapping
Forms and Documents for Download
Town Code - Zoning Regulations
(Page will open in new browser window. Once the page loads, please click on 'Bethel, Town' to reach the Town Code)
Links
The FINAL 2007 Plan of Development may be downloaded here in PDF version. The first link is to the full document. This is a large download and will take several minutes to load. Individual chapters may also be downloaded below.
Bethel 2007 FINAL Plan of Conservation and Development October 30, 2007 (16.5 mb complete document)
Table of Contents and Introduction (276 k)
Conditions and Trends (4.6 mb)
Conservation Themes (2.5 mb)
Development Themes (3.6 mb)
Infrastructure Themes (3.9 mb)
Future Land Use Plans (2.3 mb)
Implementation (212 k)
Conclusion (96 k)
Plan of Development Archives
Link here to download a free Adobe Reader
|